Power Connection of the Offshore Wind Farm Baltic 1

Power Connection of the Offshore Wind Farm Baltic 1

Project description:

Partial Projects: Cable tray in the river Breitling and in the Baltic Sea

  • 60 km submarine power cable from the offshore substation Baltic 1 to the shore connection Markgrafenheide;
  • 2.7 km submarine power caple through the river Breitling;
  • 4 intersections of power cables and telecommunication cables;
  • Cable laying into the water bed through jetting, into overt submarine cable ditches and through utilization of existing empty conduits;
  • Covering of the cable 1 to 1.5 m.

Project location:
Rostock, Meckenburg-Western Pomerania

Services:
Implementation Planning

Time:
2010

Client:

50Hertz Offshore GmbH
Eichenstraße 3A
12435 Berlin

nkt cables GmbH
Schanzenstrasse 6-20
51063 Köln

Inros Lackner AG
Division for Environment and Civil Engineering
Rosa-Luxemburg-Straße 16
18055 Rostock