Power Connection Solar Park Jabel

Power Connection Solar Park Jabel

Project description:

  • Line Planning, 20 kV power cord from the solar park to the conjunction with the public electricity grid;
  • 8.1 km power cord for the solar park (24 ha, peak output 17.34 MWp);
  • Cable laying on public and private field parts.
  • Design:          4.9 km cable burying plough;
                            1.3 km exposed cable trench;
                            1.9 km controlled pipe jacking up to 300 m single length of a drilling.

                  

Project location:
Jabel, Mecklenburg-Western Pomerania

Services:
Draft Planning, Approval Planning, Implementation Planning

Time:
2011

Client:

juwi Solar LLC
Office Brandis
Am Alten Flugplatz 1
04821 Brandis